Expertise / Mining & Geotechnical

Dam safety reviews & performance

Develop a Dam Safety Review around the facility's condition, design basis, operating history and current knowledge. Connect record review, site observations and technical assessments to practical, prioritised findings.

Discuss this service ↗
Hoover Dam viewed from the Colorado River
Illustrative industry photography · Alissa Coes / USGS / Public domain · Image information

The engagement

What the work
can involve.

We tailor the scope to the decision you need to make, the available information and the project stage.

Illustrative discussion of drawings and technical documents
  1. 01

    Define the review mandate, required expertise, independence, site coverage and assessment criteria.

  2. 02

    Review design assumptions, construction and as-built records, material characterisation and changes through the lifecycle.

  3. 03

    Examine instrumentation, surveillance, incidents and outstanding recommendations against expected performance.

  4. 04

    Document conclusions, evidence limitations, further investigations and matters requiring owner decisions.

Agreeing responsibilities

Review frequency, competence, independence and acceptance arrangements are determined for the facility. The required disciplines and any separate studies are confirmed in the appointment.

The output

Defined work.
Useful deliverables.

  • Review plan and document register
  • Site observations and technical assessment records
  • DSR report within the agreed professional scope
  • Recommendations and action close-out evidence requirements

What to bring to the first discussion

Previous reviews, design and construction records, inspection reports, instrumentation data, incidents and the required review basis.

You can start with an outline of the information you have. We will agree the document list and transfer method before you send confidential material.

Assessment context / sources checked 4 October 2026

Agree the basis before assessing the evidence.

ANCOLD tailings dam guidance ↗

ANCOLD describes its guidelines as guidance for experienced practitioners, rather than a design code or standard. Applicable publications and editions belong in the project assessment basis.

Before you enquire

A clearer conversation
from the start.

Make a preparation checklist ↗
What information should I prepare?

Previous reviews, design and construction records, inspection reports, instrumentation data, incidents and the required review basis. You can begin with a short summary and a list of the documents available.

How will the work be priced?

The proposal is based on the agreed tasks, available information, deliverables, site requirements and review effort. Formal appointments and specialist inputs are scoped separately. No price is confirmed by this website.

Can I enquire with incomplete information?

Yes. Tell us the decision or outcome you need and what is still unknown. We can discuss the information and professional input needed before the scope and timing are agreed.

Working together

A scope you can review.

The proposal identifies tasks, deliverables, inputs, dependencies, exclusions and pricing. Open questions remain visible so the next decision is informed.

Ask NOVA Agent